Quoting a roof before the ladder comes out · Zonneplan

Quoting a solar roof before anyone climbs a ladder.

A concept for Zonneplan's solar advisors and planners. AI proposes a panel layout from aerial data with shading shown up front, the advisor adjusts it and sends a quote the same day, and one roof visit confirms everything before installation.

Self-initiated concept. Not affiliated with or endorsed by Zonneplan.

Role
Self-initiated concept, from field research to tested prototype
Company
Zonneplan (concept)
Timeline
Aug to Oct 2025 · between jobs
Team
Solo, with 2 solar installers and 5 sales advisors who joined research and tests
Platforms
Internal web tool for advisors, Tablet survey on the roof, Customer quote page

1Layout proposed from the aerial photo and roof height data

2Shading shows up before anyone visits the roof

3Advisors can move, add or remove panels before quoting

35 → 6 min

From address to first quote, in tests

17 of 20

AI layouts within one panel of the installed roof

1

Roof visit per customer, after they say yes

5 of 5

Advisors who preferred it to drawing by hand

The problem

The installers and advisors I met still visit most roofs before they can quote, draw layouts on printed aerial photos, and explain shading from memory. Customers wait days for a number, and planners juggle crews in spreadsheets.

What I did

In the three months between my two jobs, I joined roof visits with independent installers, interviewed advisors, and designed a concept in Zonneplan's visual identity: an AI layout with visible shading, a tablet survey that checks the estimate on the roof, crew planning that knows about electricians and rain, and the customer's quote.

What changed

In tests with five advisors, a first quote took 6 minutes instead of 35. On 20 roofs with known installations, 17 AI layouts were within one panel of what was actually installed.

01 · Context

Why I picked Zonneplan.

Zonneplan sells solar panels, home batteries, charging points and an energy contract, and it's one of the fastest-growing energy companies in the Netherlands. After five years in energy software, I wanted to work on the part of the energy transition that happens on people's roofs.

This is a self-initiated concept, made in the gap between Schneider Electric and PackBack. I don't work for Zonneplan. The research is with independent installers and advisors, and the design follows Zonneplan's public visual identity.

  1. 01LeadWeb form or phone
  2. 02Roof visitAdvisor on site, 1 to 2 hours
  3. 03Layout by handPrinted aerial photo
  4. 04Quote typedDays later
  5. 05Crew plannedSpreadsheet and calls

Steps the concept replaces or shortens

Fig. 1How the installers I met work today.

02 · Problem

Slow quotes lose customers.

Every advisor told the same story: customers ask three companies for a quote and sign with the first one that sends a clear, believable number. A roof visit before every quote makes that hard.

The question I worked on

How might an advisor send a trustworthy quote the same day, and only climb the roof once, when the customer has said yes?

03 · Research

On roofs and in planning offices.

I joined four roof visits with two independent installers, interviewed five sales advisors, and compared 20 roofs in Haarlem and Leiden where I knew the final installation with what a simple rule set would have proposed from aerial photos.

Insight 1

Most layouts follow the same rules

Fire-safety margins, chimney and dormer clearances and orientation. On terraced houses, the rules alone got close almost every time.

“I draw the same thing on every terraced house.”

RoelSales advisor
Insight 2

Shading is the first question

Customers worried about trees and chimneys. Advisors explained shading verbally, and customers forgot it by the time the quote arrived.

“Will the tree in the back garden ruin it? That's always the first question.”

MerelSales advisor
Insight 3

Reschedules come from missing information

An unchecked fuse box, a missing electrician or rain caused most of the lost installation days the installers described.

“We arrive, the meter cupboard needs work, and the whole day is gone.”

GerritInstaller and planner

04 · Process

Twelve weeks from roof to prototype.

Week 024681012
Roof visits, interviews
Layout rules, 20 roofs
Advisor tool
Tablet survey
Crew planning, quote
Tests with advisors
◆ 17 of 20 layouts match◆ Prototype
Fig. 2August to October 2025.
Option ARejected

Fully automatic online quote

Fast, but advisors said customers want a person to explain shading and price, and the numbers need checking.

Option BTested

Faster roof visits

A better visit checklist helps, but still needs a visit before every quote.

Option CChosen

AI layout, advisor checks, roof confirms

The advisor adjusts the AI layout and sends the quote. The roof is visited once, to confirm before installation.

Fig. 3Three ways to speed up quoting.

05 · Design decisions

Layout, quote, survey, schedule.

Shading is shown before the customer asks

The layout draws shade from chimneys, dormers and nearby trees, with the hours they affect. Advisors in the tests used that picture to answer the tree question on the first call.

Fig. 4The customer's quote page, with the layout, yearly yield by month and a home battery option.

The roof visit confirms the estimate

The tablet survey lists exactly what to measure: pitch, rafter spacing, fuse box and inverter location. If a measurement differs from the estimate, the layout updates and the advisor is told before the customer is.

Fig. 5The roof survey on a tablet, working offline. The pitch differs by 3°.

Planning that knows about electricians and rain

The crew board flags jobs that need an electrician on day two and days with a high chance of rain. Dragging a job onto a conflict shows the problem before it's saved.

Fig. 6The crew planning board.

06 · Results

What the tests showed.

Drawing by hand ConceptLower is better
Minutes from address to first quote
35
6(-83%)
Panels moved after the roof visit
2.4
0.6(-75%)
Fig. 7Five advisors, the same three addresses each. 'Panels moved' compares with the installer's final layout.

“I'd send this while they're still on the phone, with the shading picture. That closes it.”

RoelSales advisor

“The board telling me I forgot the electrician would save us a day a week.”

GerritInstaller and planner
Fig. 8From the test sessions.

07 · Reflection

What I learned.

Designing for a company I don't work at forced me to get closer to the real work: roofs, fuse boxes and planning boards. It was also a good warm-up for PackBack, where the product is half software and half physical work.

Tools on this project

Figma, FigJam, ProtoPie, Public aerial imagery, Notion

Names of the people quoted have been changed to protect their privacy.